Donut Stand
Donut Stand
Shortening kettle can
Shortening kettle
Shortening kettle lid bungee
Notes:
Leave kettle plug inserted and temperature gauge set to maximum so the kettle can be plugged in and heated up while in the can.
If the donut machine has been emptied, the kettle should be 3/4 full. If the donut machine if pre-filled, the kettle should be half full.